Lorient Infrastructure

Lorient Infrastructure

Lorient infrastruture was created in 2007 with a view to the construction of the maxi trimaran Banque Populaire 5. This unique site enables direct access to the water in a zone dedicated to naval construction, with some extraordinary means at its disposal for launching (up to 650T).

Lorient building I

Surface aera: 1700 m2

  • Quay surface: 1000 m2
  • Workshop length: 45m
  • Workshop width: 30m
  • Height: 12m
  • Door opening: 47 m x 8.5 m
  • Handling via 650-tonne hoist. 300-tonne crane. 150-tonne hydraulic trailer

 

Lorient buiding II Class oven

Class oven:120°C36 m x 10m x 7m 

Lorient building III

Surface : 1000 m2

 

Class autoclave

Class autoclave classe 200°C à 10 bars 25mX4m

L’email a bien été copié

Digital material-cutting table

Digital material-cutting table

3-axis machining centre

 3-axis machining centre