Presentation

CDK true laboratory of high technology obtained tools of point. It ensures all the means of productions and part of the assembly, for the large units like Banque Populaire V; the assembly is carried out at Keroman Technologie (Lorient) its subsidiary company which accommodates the large units, refit (maintains, restoration, lifting)…

CDK Technologies Port la Fôret

Building I surface (workshop+office): 1100 m2


Platform surface: 2800 m2

Workshop length: 35 m

Workshop width: 29 m

Height: 8 m

Door opening: 28 m x 5 m

Kiln: 30 m x 7 m x 4 m, de 400 Kw pour 180°C

Autoclave:12,50 m de long pour 1,60 m de diamètre de 3 bars pour 130°C

Oven: 1 mx 1 m x 1,80 m pour 250°C

Set up: 1986

CDK Technologies Port la Fôret

Building II surface (workshop): 700 m2


Platform surface: 2000 m2

Workshop length: 31 m

Workshop width: 22,50 m

Height: 10 m

Door opening: 22,5 m x 700 m

Handing (marina): 30 tonnes fork lift truck, 50 and 250 tonne crane, hydraulic 18 tonnes traiter

Set up: 2002

CDK Technologies Port la Fôret

Building III surface (workshop): 600 m2


Platform surface: 3400 m2

Workshop length: 30 m

Workshop width: 20,50 m

Height: 8 m

Door opening: 20 m x 400 m


Set up: 2002

Keroman Technologies Lorient


Building I surface (workshop): 1700 m2

Private Platform surface: 1000 m2

Workshop length: 45 m

Workshop width: 30 m

Height: 12 m

Door opening: 22,5 m x 8,5 m

Handling (fishing port) :600 tonnes for lift truck, 300 tonne crane, hydraulic 150 tonne traiter

Set up: October 2007